| 2009 / EQUIPAMIENTO / L / RESIDENCIAL |
| Concurso: | CENTRO INTERGENERACIONAL | | Situación: | PALMA DE MALLORCA
| | Fecha: | JUNIO 2009
| | Superficie: | 1.520 M2
| | Promotor: | PATRONAT DE L'HABITATGE DE PALMA | | Presupuesto: | 1.158.976€ | | Equipo redactor: | MOHO ARQUITECTOS + MARÍA NICOLAU PLANAS
|
|
Intergenerational Center in Palma competition
|
The proposal responds to an area located right on the border between two different urban patterns . The building facade intended to reflect this through a transition of different scales of hollow, from larger and more public, ones, to the most domestic and small ones. The cover shot makes up a significant part that defines the image of the building at urban level. It aims to promote the use of their spaces and relate them to a compositional languag linked to an organic image.
|
|
| 2009 / EQUIPAMIENTO / L |
| Proyecto: | CENTRO MULTIFUNCIONAL DE LA CULTURA EN CARAVACA DE LA CRUZ
| | Situación: | CARAVACA DE LA CRUZ
| | Fecha: | FEBRERO 2009
| | Superficie: | XXXX M2
| | Promotor: | AYTO DE CARAVACA DE LA CRUZ
| | Presupuesto: | XXXX €
| | Equipo redactor: | MOHO ARQUITECTOS + CARLOS ABADÍA SANCHEZ
|
|
Multifunctional Center in Caravaca competition
|
A sweeping and sculptural piece, obtained by optimizing the capable volume of an auditorium with 1087 seats. The inclination of the theatre hall, next to the space of the stage, generates "V" shaped volume, clearly identifiable in its northern facade, which aims to become a new monumental icon for Caravaca . The upper end of the hall forms the main facade (E), as a large projecting balcony which rises above a square generated by the partially burying of the proposed program. |
|
| 2009 / EQUIPAMIENTO / L |
| Proyecto: | CENTRO DOCENTE DE E.S.O. Y BACHILLERATO EN SAGUNTO | | Situación: | SAGUNT PORT. VALENCIA
| | Fecha: | MARZO 2009
| | Superficie: | 11.514 M2
| | Promotor: | CIEGSA | | Presupuesto: | XXXX €
| | Equipo redactor: | MOHO ARQUITECTOS
|
|
High School in Sagunto {st competition 9
|
We offer an alternative to distribution spaces, commonly developed in linear schemes such as "comb", where they function as mere few interesting and low usability corridors Our project articulates the intended program around a large central space of communication and relationship, crossed by courtyards that qualify some so versatile areas A place to talk, enjoy temporary exhibitions etc. ..
|
|
| 2008 / EQUIPAMIENTO / L |
| Proyecto: | FILMOTECA REGIONAL DE CASTILLA LA MANCHA Y CENTRO JOVEN DE COMUNICACIÓN Y NUEVAS TECNOLOGÍAS | | Situación: | ALBACETE | | Fecha: | AGOSTO 2008 | | Superficie: | 4900 M2 | | Promotor: | URVIAL | | Presupuesto: | | | Equipo redactor: | MOHO ARQUITECTOS |
|
Film Library in Albacete competition
|
A logical , compact and economical tresponse to solve a complex problem. As result, two buildings which integrate colorful programs and difficult compatibility requirements between them.
Functional economic and constructively feasibility; own image and identity ,well differenced for each building; strictest Compliance with the program; flexible and modular spaces, and architectural and environmental quality are the studied criteria in the making of this project.
|
|
| 2008 / EQUIPAMIENTO / XL |
| Proyecto: | CENTRO NACIONAL DE NEUROCIENCIAS SANTIAGO RAMÓN Y CAJAL | | Situación: | ALCALA DE HENARES. MADRID | | Fecha: | MARZO 2008 | | Superficie: | 19.000 M2 | | Promotor: | CSIC | | Presupuesto: | | | Equipo redactor: | MOHO ARQUITECTOS + CARLOS ABADÍA SÁNCHEZ |
|
Neuroscience National Center competition
|
A great building for scientific use where the lab pieces occupy almost the entire program . They are disposed forming bands , slightly nterlaced in section, as means of expression to form a representative and accessible green fronts with parking spaces . A "comb-shape" scheme easily provides the future extensions, as optimizes management facilities, maintenance and registration. The "more urban" west front offers a neutral and pixilated image,because orf the offices and common areas.
|
|
| 2005 / EQUIPAMIENTO / S |
| Proyecto: | PARADA TIPO PARA LA NUEVA LINEA DEL TRAM. | | Situación: | CIUDAD DE ALICANT. LINEA 2 | | Fecha: | MARZO 2005
| | Superficie: | 60M2 | | Promotor: | TRANSPORTE DE LA GENERALITAT | | Equipo redactor: | MOHO ARQUITECTOS
|
|
TRAM stop in Alicante second prize
|
Urban light-woven interface
"A tram stop is not an another obstacle in the city but a gateway to other parts of it "
We use enlightenment as a resource to provide a changing image, texture and identity to the piece , making it a city icon both for the user and for the city as a whole. |
|